Mount Rig Setup
Mount rig setup is the part of the job the client sees least and feels the most. On the first morning the crew lays out boom arm sections, standoffs and rail stock on a clean sheet, checks every joint by hand and confirms the torque values against the manufacturer sheet. We build the rig flat, then walk it upright as a pair so nothing twists on the lift. If the room has a low ceiling or a tight return wall, the boom arm is shortened at the bench rather than forced into place in the air. The rig is not left unbraced at any point. When it goes up, the crew reads the level bubble against the rail and adjusts the standoffs before the first anchor is set.